logo
  • Have you forgotten your password?
logo
    • Have you forgotten your password?
  1. Home
  2. Archival Material
  3. 1913 Resolve Chap. 0093. Resolve To Direct The Boston Transit Commission To Investigate And Report Upon The Advisability And Cost Of Constructing A Subw^Ay To Connect The Dorchester Tunnel With The South Terminal Station In The City Of Boston.
 

1913 Resolve Chap. 0093. Resolve To Direct The Boston Transit Commission To Investigate And Report Upon The Advisability And Cost Of Constructing A Subw^Ay To Connect The Dorchester Tunnel With The South Terminal Station In The City Of Boston.

Main Digital Collection
1900-1939  
Acts and Resolves  
Digital Collection
1913  
URI
https://archives.lib.state.ma.us/handle/2452/817545
Author(s)
Massachusetts.
Publisher
Boston: Secretary of the Commonwealth
Date Issued
1913
  • Relations
Digital Collection
1913  
File(s)
Thumbnail Image
Name

1913resolves0093.pdf

Size

68.6 KB

Format

Adobe PDF

Checksum (MD5)

3bbadb0296a125772ea35aef7ae01d9c

Institutions involved

State Library of Massachusetts Ask a Librarian Sign up for the State Library‘s Mailing List

Social media

Send FeedbackCookie settingsPrivacy policy
Built with DSpace-GLAM - Extension maintained and optimized by 4Science