1913 Resolve Chap. 0093. Resolve To Direct The Boston Transit Commission To Investigate And Report Upon The Advisability And Cost Of Constructing A Subw^Ay To Connect The Dorchester Tunnel With The South Terminal Station In The City Of Boston.
Main Digital Collection
Digital Collection
Author(s)
Massachusetts.
Publisher
Boston: Secretary of the Commonwealth
Date Issued
1913
Digital Collection
File(s)![Thumbnail Image]()
Name
1913resolves0093.pdf
Size
68.6 KB
Format
Adobe PDF
Checksum (MD5)
3bbadb0296a125772ea35aef7ae01d9c
