JavaScript is disabled for your browser. Some features of this site may not work without it.
1981 Senate Bill 2305. Resolve Providing For An Investigation And Study By A Special Commission Relative To The Costs Incurred By The Boston Edison Company As A Result Of Its Preliminary Investigation Into Constructing The Pilgrim II Nuclear Power Plant, So-Called, In The Town Of Plymouth.